US Bridges

IR76 Ramp Ov Sweit over I76RAMP W-5A/SWEITZER/CS

Good

Summit County, Ohio · 0.73 MI E of SR 59 · Structure no. 7703287

Built
2019
6 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
210 ft
3 main spans
Daily traffic
3,350
2017 count
Owner
State
State Highway Agency

About this bridge

IR76 Ramp Ov Sweit over I76RAMP W-5A/SWEITZER/CS is a steel continuous stringer/multi-beam or girder carrying IR76 Ramp Ov Sweit over I76RAMP W-5A/SWEITZER/CS in Summit County, Ohio. It was built in 2019, so it is 6 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,350 vehicles a day, roughly 7% of them trucks, projected to reach 3,350 by 2037. The structure is 210 ft (63.9 m) long and 45 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesIR76 Ramp Ov Sweit
CrossesI76RAMP W-5A/SWEITZER/CS
Location0.73 MI E of SR 59
RouteInterstate 76
StateOhio
Coordinates41.06295, -81.52578
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating64.3 US tons
Inventory rating50 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length210 ft (63.9 m)
Longest span78 ft (23.7 m)
Deck width45 ft (13.8 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,350 (2017)
Projected traffic3,350 by 2037
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$84.2 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was IR76 Ramp Ov Sweit over I76RAMP W-5A/SWEITZER/CS built?

It was built in 2019, making it 6 years old in 2025.

What condition is IR76 Ramp Ov Sweit over I76RAMP W-5A/SWEITZER/CS in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does IR76 Ramp Ov Sweit over I76RAMP W-5A/SWEITZER/CS carry?

About 3,350 vehicles per day (2017 count), of which roughly 7% are trucks.

How long is IR76 Ramp Ov Sweit over I76RAMP W-5A/SWEITZER/CS?

The structure is 210 ft (63.9 m) long with a longest span of 78 ft (23.7 m) and a deck 45 ft wide.

Who owns IR76 Ramp Ov Sweit over I76RAMP W-5A/SWEITZER/CS?

It is owned by the State Highway Agency.