US Bridges

I-76 over Ir 76 Ov S Main Street

Good

Summit County, Ohio · 0.61 MI E of SR 59 · Structure no. 7703317

Built
2018
7 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
167 ft
1 main span
Daily traffic
90,300
2017 count
Owner
State
State Highway Agency

About this bridge

I-76 over Ir 76 Ov S Main Street is a steel stringer/multi-beam or girder carrying I-76 over Ir 76 Ov S Main Street in Summit County, Ohio. It was built in 2018, so it is 7 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 90,300 vehicles a day, roughly 13% of them trucks, projected to reach 90,300 by 2037. The structure is 167 ft (51 m) long and 186 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI-76
CrossesIr 76 Ov S Main Street
Location0.61 MI E of SR 59
RouteInterstate 76
StateOhio
Coordinates41.06226, -81.52755
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.7 US tons
Inventory rating46.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length167 ft (51 m)
Longest span167 ft (51 m)
Deck width186 ft (56.7 m)
Roadway width180 ft (54.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic90,300 (2017)
Projected traffic90,300 by 2037
Trucks13%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$84.2 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-76 over Ir 76 Ov S Main Street built?

It was built in 2018, making it 7 years old in 2025.

What condition is I-76 over Ir 76 Ov S Main Street in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does I-76 over Ir 76 Ov S Main Street carry?

About 90,300 vehicles per day (2017 count), of which roughly 13% are trucks.

How long is I-76 over Ir 76 Ov S Main Street?

The structure is 167 ft (51 m) long with a longest span of 167 ft (51 m) and a deck 186 ft wide.

Who owns I-76 over Ir 76 Ov S Main Street?

It is owned by the State Highway Agency.