Grant Street over IR76 & IR77 NB Only
GoodSummit County, Ohio · 0.68 MI W of SR 8 · Structure no. 7703104
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 188 ft
- 2 main spans
- Daily traffic
- 3,017
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Grant Street over IR76 & IR77 NB Only is a steel continuous stringer/multi-beam or girder carrying Grant Street over IR76 & IR77 NB Only in Summit County, Ohio. It was built in 2017, so it is 8 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,017 vehicles a day, roughly 5% of them trucks, projected to reach 4,750 by 2035. The structure is 188 ft (57.2 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Grant Street over IR76 & IR77 NB Only built?
It was built in 2017, making it 8 years old in 2025.
What condition is Grant Street over IR76 & IR77 NB Only in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Grant Street over IR76 & IR77 NB Only carry?
About 3,017 vehicles per day (2015 count), of which roughly 5% are trucks.
How long is Grant Street over IR76 & IR77 NB Only?
The structure is 188 ft (57.2 m) long with a longest span of 94 ft (28.8 m) and a deck 51 ft wide.
Who owns Grant Street over IR76 & IR77 NB Only?
It is owned by the State Highway Agency.