I-670 EB over IR670EB-RAMPS V3 W1 W2X4
GoodFranklin County, Ohio · 0.20 MI E of SR3/CLEV Ave · Structure no. 2506416
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 1,690 ft
- 9 main spans
- Daily traffic
- 45,763
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
I-670 EB over IR670EB-RAMPS V3 W1 W2X4 is a steel continuous stringer/multi-beam or girder carrying I-670 EB over IR670EB-RAMPS V3 W1 W2X4 in Franklin County, Ohio. It was built in 2013, so it is 12 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 45,763 vehicles a day, roughly 6% of them trucks, projected to reach 63,519 by 2035. The structure is 1,690 ft (515.1 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-670 EB over IR670EB-RAMPS V3 W1 W2X4 built?
It was built in 2013, making it 12 years old in 2025.
What condition is I-670 EB over IR670EB-RAMPS V3 W1 W2X4 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does I-670 EB over IR670EB-RAMPS V3 W1 W2X4 carry?
About 45,763 vehicles per day (2015 count), of which roughly 6% are trucks.
How long is I-670 EB over IR670EB-RAMPS V3 W1 W2X4?
The structure is 1,690 ft (515.1 m) long with a longest span of 223 ft (68 m) and a deck 43 ft wide.
Who owns I-670 EB over IR670EB-RAMPS V3 W1 W2X4?
It is owned by the State Highway Agency.