US Bridges

Ramp to NB & SB 71 over Ramp Ovr Clev Ave (sr 3)

Good

Franklin County, Ohio · 0.24 Miles West of IR-71 · Structure no. 2517515

Built
2012
13 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
119 ft
1 main span
Daily traffic
85,145
2010 count
Owner
State
State Highway Agency

About this bridge

Ramp to NB & SB 71 over Ramp Ovr Clev Ave (sr 3) is a prestressed concrete stringer/multi-beam or girder carrying Ramp to NB & SB 71 over Ramp Ovr Clev Ave (sr 3) in Franklin County, Ohio. It was built in 2012, so it is 13 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 85,145 vehicles a day, roughly 7% of them trucks, projected to reach 118,181 by 2030. The structure is 119 ft (36.3 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRamp to NB & SB 71
CrossesRamp Ovr Clev Ave (sr 3)
Location0.24 Miles West of IR-71
RouteInterstate 670
StateOhio
Coordinates39.9716, -82.99051
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.6 US tons
Inventory rating45 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length119 ft (36.3 m)
Longest span117 ft (35.6 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic85,145 (2010)
Projected traffic118,181 by 2030
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp to NB & SB 71 over Ramp Ovr Clev Ave (sr 3) built?

It was built in 2012, making it 13 years old in 2025.

What condition is Ramp to NB & SB 71 over Ramp Ovr Clev Ave (sr 3) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Ramp to NB & SB 71 over Ramp Ovr Clev Ave (sr 3) carry?

About 85,145 vehicles per day (2010 count), of which roughly 7% are trucks.

How long is Ramp to NB & SB 71 over Ramp Ovr Clev Ave (sr 3)?

The structure is 119 ft (36.3 m) long with a longest span of 117 ft (35.6 m) and a deck 43 ft wide.

Who owns Ramp to NB & SB 71 over Ramp Ovr Clev Ave (sr 3)?

It is owned by the State Highway Agency.