US Bridges

I-670 EB over Over Cleveland Ave (sr 3

Good

Franklin County, Ohio · 0.24 MI W of IR-71 · Structure no. 2517477

Built
2013
12 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
117 ft
1 main span
Daily traffic
22,882
2015 count
Owner
State
State Highway Agency

About this bridge

I-670 EB over Over Cleveland Ave (sr 3 is a prestressed concrete stringer/multi-beam or girder carrying I-670 EB over Over Cleveland Ave (sr 3 in Franklin County, Ohio. It was built in 2013, so it is 12 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,882 vehicles a day, roughly 6% of them trucks, projected to reach 31,760 by 2035. The structure is 117 ft (35.7 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-670 EB
CrossesOver Cleveland Ave (sr 3
Location0.24 MI W of IR-71
RouteInterstate 670
StateOhio
Coordinates39.97181, -82.99052
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.1 US tons
Inventory rating42.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length117 ft (35.7 m)
Longest span115 ft (35 m)
Deck width44 ft (13.3 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,882 (2015)
Projected traffic31,760 by 2035
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-670 EB over Over Cleveland Ave (sr 3 built?

It was built in 2013, making it 12 years old in 2025.

What condition is I-670 EB over Over Cleveland Ave (sr 3 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does I-670 EB over Over Cleveland Ave (sr 3 carry?

About 22,882 vehicles per day (2015 count), of which roughly 6% are trucks.

How long is I-670 EB over Over Cleveland Ave (sr 3?

The structure is 117 ft (35.7 m) long with a longest span of 115 ft (35 m) and a deck 44 ft wide.

Who owns I-670 EB over Over Cleveland Ave (sr 3?

It is owned by the State Highway Agency.