US Bridges

I-95 Exit 10 Ramp over RTE I95

Fair

Bronx County, New York · 0.1 Mi. N. of H.R. Prkwy · Structure no. 000000005075380

Built
1957
68 years old, rebuilt 1989
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
124 ft
1 main span
Daily traffic
—
2017 count
Owner
Toll Authority
State Toll Authority

About this bridge

I-95 Exit 10 Ramp over RTE I95 is a steel stringer/multi-beam or girder carrying I-95 Exit 10 Ramp over RTE I95 in Bronx County, New York. It was built in 1957 and reconstructed in 1989, so it is 68 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

No traffic count is recorded. The structure is 124 ft (37.8 m) long and 35 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-95 Exit 10 Ramp
CrossesRTE I95
Location0.1 Mi. N. of H.R. Prkwy
RouteCity Street 0
Coordinates40.86216, -73.82958
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating93 US tons
Inventory rating43 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length124 ft (37.8 m)
Longest span118 ft (36 m)
Deck width35 ft (10.7 m)
Roadway width32 ft (9.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic—
Projected traffic—
Trucks8%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusHistorical significance not determinable at this time
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$5.8 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 Exit 10 Ramp over RTE I95 built?

It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1989.

What condition is I-95 Exit 10 Ramp over RTE I95 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does I-95 Exit 10 Ramp over RTE I95 carry?

No traffic count is recorded for this structure.

How long is I-95 Exit 10 Ramp over RTE I95?

The structure is 124 ft (37.8 m) long with a longest span of 118 ft (36 m) and a deck 35 ft wide.

Who owns I-95 Exit 10 Ramp over RTE I95?

It is owned by the State Toll Authority.