RTE I95 over 908A RTE 908A
FairBronx County, New York · JCT I95& Hutchinson R Pky · Structure no. 000000005066651
- Built
- 1940
- 85 years old, rebuilt 1989
- Condition
- Fair
- inspected September 2024
- Type
- Arch - Deck
- Concrete Continuous
- Length
- 117 ft
- 2 main spans
- Daily traffic
- 9,061
- 2019 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
RTE I95 over 908A RTE 908A is a concrete continuous arch - deck carrying RTE I95 over 908A RTE 908A in Bronx County, New York. It was built in 1940 and reconstructed in 1989, so it is 85 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,061 vehicles a day, roughly 6% of them trucks, projected to reach 9,103 by 2041. The structure is 117 ft (35.7 m) long and 52 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I95 over 908A RTE 908A built?
It was built in 1940, making it 85 years old in 2025. It was reconstructed in 1989.
What condition is RTE I95 over 908A RTE 908A in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does RTE I95 over 908A RTE 908A carry?
About 9,061 vehicles per day (2019 count), of which roughly 6% are trucks.
How long is RTE I95 over 908A RTE 908A?
The structure is 117 ft (35.7 m) long with a longest span of 57 ft (17.4 m) and a deck 52 ft wide.
Who owns RTE I95 over 908A RTE 908A?
It is owned by the State Toll Authority.