Tenaya Way over Summerlin Pkwy
GoodClark County, Nevada · West of Las Vegas · Structure no. H2858
- Built
- 2010
- 15 years old
- Condition
- Good
- inspected February 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 274 ft
- 2 main spans
- Daily traffic
- 4,350
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Tenaya Way over Summerlin Pkwy is a prestressed concrete continuous box beam or girders - single or spread carrying Tenaya Way over Summerlin Pkwy in Clark County, Nevada. It was built in 2010, so it is 15 years old, younger than the Nevada average of 36.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,350 vehicles a day, roughly 1% of them trucks, projected to reach 4,343 by 2040. The structure is 274 ft (83.6 m) long and 64 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tenaya Way over Summerlin Pkwy built?
It was built in 2010, making it 15 years old in 2025.
What condition is Tenaya Way over Summerlin Pkwy in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Tenaya Way over Summerlin Pkwy carry?
About 4,350 vehicles per day (2021 count), of which roughly 1% are trucks.
How long is Tenaya Way over Summerlin Pkwy?
The structure is 274 ft (83.6 m) long with a longest span of 135 ft (41 m) and a deck 64 ft wide.
Who owns Tenaya Way over Summerlin Pkwy?
It is owned by the City or Municipal Highway Agency.