US Bridges

Rmp 95S to Rainbow over Summerlin Pw & Rainb Rmp

Good

Clark County, Nevada · Las Vegas · Structure no. I1843E

Built
2006
19 years old
Condition
Good
inspected December 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
311 ft
3 main spans
Daily traffic
9,050
2021 count
Owner
State
State Highway Agency

About this bridge

Rmp 95S to Rainbow over Summerlin Pw & Rainb Rmp is a prestressed concrete continuous box beam or girders - multiple carrying Rmp 95S to Rainbow over Summerlin Pw & Rainb Rmp in Clark County, Nevada. It was built in 2006, so it is 19 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,050 vehicles a day, roughly 2% of them trucks, projected to reach 20,268 by 2040. The structure is 311 ft (94.8 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRmp 95S to Rainbow
CrossesSummerlin Pw & Rainb Rmp
LocationLas Vegas
RouteU.S. Route 95
StateNevada
Coordinates36.17753, -115.24682
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating81.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length311 ft (94.8 m)
Longest span128 ft (38.9 m)
Deck width60 ft (18.3 m)
Roadway width57 ft (17.4 m)
Vertical clearance over deck18 ft (5.5 m)

Traffic and service

Average daily traffic9,050 (2021)
Projected traffic20,268 by 2040
Trucks2%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Rmp 95S to Rainbow over Summerlin Pw & Rainb Rmp built?

It was built in 2006, making it 19 years old in 2025.

What condition is Rmp 95S to Rainbow over Summerlin Pw & Rainb Rmp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Rmp 95S to Rainbow over Summerlin Pw & Rainb Rmp carry?

About 9,050 vehicles per day (2021 count), of which roughly 2% are trucks.

How long is Rmp 95S to Rainbow over Summerlin Pw & Rainb Rmp?

The structure is 311 ft (94.8 m) long with a longest span of 128 ft (38.9 m) and a deck 60 ft wide.

Who owns Rmp 95S to Rainbow over Summerlin Pw & Rainb Rmp?

It is owned by the State Highway Agency.