US Bridges

Tenaya Way over Bonanza Ped Trail

Good

Clark County, Nevada · West Las Vegas · Structure no. B3195

Built
2010
15 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
20 ft
1 main span
Daily traffic
4,350
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Tenaya Way over Bonanza Ped Trail is a concrete culvert carrying Tenaya Way over Bonanza Ped Trail in Clark County, Nevada. It was built in 2010, so it is 15 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,350 vehicles a day, projected to reach 11,995 by 2040. The structure is 20 ft (6.1 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesTenaya Way
CrossesBonanza Ped Trail
LocationWest Las Vegas
RouteCity Street 0
StateNevada
Coordinates36.17857, -115.2509
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Culvert8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating21.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20 + Mod
Structure length20 ft (6.1 m)
Longest span20 ft (6.1 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,350 (2021)
Projected traffic11,995 by 2040
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesPedestrian / bicycle
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Tenaya Way over Bonanza Ped Trail built?

It was built in 2010, making it 15 years old in 2025.

What condition is Tenaya Way over Bonanza Ped Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Tenaya Way over Bonanza Ped Trail carry?

About 4,350 vehicles per day (2021 count).

How long is Tenaya Way over Bonanza Ped Trail?

The structure is 20 ft (6.1 m) long with a longest span of 20 ft (6.1 m).

Who owns Tenaya Way over Bonanza Ped Trail?

It is owned by the City or Municipal Highway Agency.