US Bridges

Rmp EB SMRLN-US95N over US95

Good

Clark County, Nevada · Las Vegas · Structure no. I1210R

Built
2006
19 years old
Condition
Good
inspected December 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
421 ft
3 main spans
Daily traffic
38,000
2021 count
Owner
State
State Highway Agency

About this bridge

Rmp EB SMRLN-US95N over US95 is a prestressed concrete continuous box beam or girders - multiple carrying Rmp EB SMRLN-US95N over US95 in Clark County, Nevada. It was built in 2006, so it is 19 years old, younger than the Nevada average of 36.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 38,000 vehicles a day, roughly 2% of them trucks, projected to reach 4,136 by 2040. The structure is 421 ft (128.2 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRmp EB SMRLN-US95N
CrossesUS95
LocationLas Vegas
RouteCity Street 0
StateNevada
Coordinates36.17716, -115.24393
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating68 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length421 ft (128.2 m)
Longest span154 ft (47 m)
Deck width31 ft (9.3 m)
Roadway width27 ft (8.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic38,000 (2021)
Projected traffic4,136 by 2040
Trucks2%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Rmp EB SMRLN-US95N over US95 built?

It was built in 2006, making it 19 years old in 2025.

What condition is Rmp EB SMRLN-US95N over US95 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Rmp EB SMRLN-US95N over US95 carry?

About 38,000 vehicles per day (2021 count), of which roughly 2% are trucks.

How long is Rmp EB SMRLN-US95N over US95?

The structure is 421 ft (128.2 m) long with a longest span of 154 ft (47 m) and a deck 31 ft wide.

Who owns Rmp EB SMRLN-US95N over US95?

It is owned by the State Highway Agency.