Loch Raven Bouleva over W Branch of Herring Run
FairBaltimore city, Maryland · 0.3 MI N of Northern Pky · Structure no. 200000BC8006020
- Built
- 1930
- 95 years old, rebuilt 1950
- Condition
- Fair
- inspected April 2024
- Type
- Culvert
- Concrete
- Length
- 30 ft
- Daily traffic
- 8,543
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Loch Raven Bouleva over W Branch of Herring Run is a concrete culvert carrying Loch Raven Bouleva over W Branch of Herring Run in Baltimore city, Maryland. It was built in 1930 and reconstructed in 1950, so it is 95 years old, older than the Maryland average of 52.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,543 vehicles a day, roughly 5% of them trucks, projected to reach 10,632 by 2042. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Loch Raven Bouleva over W Branch of Herring Run built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1950.
What condition is Loch Raven Bouleva over W Branch of Herring Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Loch Raven Bouleva over W Branch of Herring Run carry?
About 8,543 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Loch Raven Bouleva over W Branch of Herring Run?
The structure is 30 ft (9.1 m) long with a longest span of 15 ft (4.6 m).
Who owns Loch Raven Bouleva over W Branch of Herring Run?
It is owned by the City or Municipal Highway Agency.