Northern Parkway over Herring Run Perring Pkw
FairBaltimore city, Maryland · 0.4 MI E Loch Raven Blvd · Structure no. 200000BC3201010
- Built
- 1957
- 68 years old, rebuilt 1989
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 484 ft
- 5 main spans
- Daily traffic
- 1,171
- 2016 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Northern Parkway over Herring Run Perring Pkw is a steel stringer/multi-beam or girder carrying Northern Parkway over Herring Run Perring Pkw in Baltimore city, Maryland. It was built in 1957 and reconstructed in 1989, so it is 68 years old, older than the Maryland average of 52.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,171 vehicles a day, roughly 5% of them trucks, projected to reach 1,460 by 2036. The structure is 484 ft (147.5 m) long and 68 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Northern Parkway over Herring Run Perring Pkw built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1989.
What condition is Northern Parkway over Herring Run Perring Pkw in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does Northern Parkway over Herring Run Perring Pkw carry?
About 1,171 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Northern Parkway over Herring Run Perring Pkw?
The structure is 484 ft (147.5 m) long with a longest span of 112 ft (34.1 m) and a deck 68 ft wide.
Who owns Northern Parkway over Herring Run Perring Pkw?
It is owned by the City or Municipal Highway Agency.