US Bridges

Northern Parkway over Chinquapin Run

Fair

Baltimore city, Maryland · 0.3 MI W of the Alameda · Structure no. 200000BC8005020

Built
1974
51 years old
Condition
Fair
inspected October 2024
Type
Culvert
Concrete
Length
23 ft
Daily traffic
16,640
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Northern Parkway over Chinquapin Run is a concrete culvert carrying Northern Parkway over Chinquapin Run in Baltimore city, Maryland. It was built in 1974, so it is 51 years old, younger than the Maryland average of 52.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 16,640 vehicles a day, roughly 5% of them trucks, projected to reach 23,572 by 2038. The structure is 23 ft (7 m) long and 88 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNorthern Parkway
CrossesChinquapin Run
Location0.3 MI W of the Alameda
RouteCity Street 1022
Coordinates39.36556, -76.5993
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating42 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans0
Design loadUnknown
Structure length23 ft (7 m)
Longest span11 ft (3.4 m)
Deck width88 ft (26.9 m)
Roadway width88 ft (26.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,640 (2018)
Projected traffic23,572 by 2038
Trucks5%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$50,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Northern Parkway over Chinquapin Run built?

It was built in 1974, making it 51 years old in 2025.

What condition is Northern Parkway over Chinquapin Run in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Northern Parkway over Chinquapin Run carry?

About 16,640 vehicles per day (2018 count), of which roughly 5% are trucks.

How long is Northern Parkway over Chinquapin Run?

The structure is 23 ft (7 m) long with a longest span of 11 ft (3.4 m) and a deck 88 ft wide.

Who owns Northern Parkway over Chinquapin Run?

It is owned by the City or Municipal Highway Agency.