US Bridges

8th ST over W Br Indian Creek

PoorPosted for load

Story County, Iowa · 000000000 · Structure no. 000000000008530

Built
1936
89 years old
Condition
Poor
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
44 ft
1 main span
Daily traffic
535
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

8th ST over W Br Indian Creek is a steel stringer/multi-beam or girder carrying 8th ST over W Br Indian Creek in Story County, Iowa. It was built in 1936, so it is 89 years old, older than the Iowa average of 45.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.

It carries about 535 vehicles a day, projected to reach 535 by 2043. The structure is 44 ft (13.4 m) long and 28 ft wide.

Carries8th ST
CrossesW Br Indian Creek
Location000000000
RouteCity Street 0
StateIowa
Coordinates42.01098, -93.44951
Functional classUrban Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck4 PoorAdvanced section loss, deterioration, spalling or scour.
Superstructure3 SeriousLoss of section, deterioration, spalling or scour have seriously affected primary structural components.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating16.6 US tons
Inventory rating9.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length44 ft (13.4 m)
Longest span41 ft (12.5 m)
Deck width28 ft (8.6 m)
Roadway width25 ft (7.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic535 (2022)
Projected traffic535 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 8th ST over W Br Indian Creek built?

It was built in 1936, making it 89 years old in 2025.

What condition is 8th ST over W Br Indian Creek in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2023.

How much traffic does 8th ST over W Br Indian Creek carry?

About 535 vehicles per day (2022 count).

How long is 8th ST over W Br Indian Creek?

The structure is 44 ft (13.4 m) long with a longest span of 41 ft (12.5 m) and a deck 28 ft wide.

Who owns 8th ST over W Br Indian Creek?

It is owned by the City or Municipal Highway Agency.