6th ST over West Indian Creek
FairStory County, Iowa · 000000000 · Structure no. 000000000049000
- Built
- 1964
- 61 years old
- Condition
- Fair
- inspected June 2023
- Type
- Girder and Floorbeam System
- Steel Continuous
- Length
- 246 ft
- 3 main spans
- Daily traffic
- 1,850
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
6th ST over West Indian Creek is a steel continuous girder and floorbeam system carrying 6th ST over West Indian Creek in Story County, Iowa. It was built in 1964, so it is 61 years old, older than the Iowa average of 45.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,850 vehicles a day, roughly 2% of them trucks, projected to reach 1,850 by 2042. The structure is 246 ft (75 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 6th ST over West Indian Creek built?
It was built in 1964, making it 61 years old in 2025.
What condition is 6th ST over West Indian Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does 6th ST over West Indian Creek carry?
About 1,850 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is 6th ST over West Indian Creek?
The structure is 246 ft (75 m) long with a longest span of 94 ft (28.7 m) and a deck 36 ft wide.
Who owns 6th ST over West Indian Creek?
It is owned by the City or Municipal Highway Agency.