US Bridges

I-95 to I-395 EB over NW 3rd Ave to NE 1st Ave

Good

Miami-Dade County, Florida · E of Midtown Interchange · Structure no. 871208

Built
2023
2 years old
Condition
Good
inspected September 2023
Type
Segmental Box Girder
Prestressed Concrete Continuous
Length
1,404 ft
10 main spans
Daily traffic
8,700
2022 count
Owner
State
State Highway Agency

About this bridge

I-95 to I-395 EB over NW 3rd Ave to NE 1st Ave is a prestressed concrete continuous segmental box girder carrying I-95 to I-395 EB over NW 3rd Ave to NE 1st Ave in Miami-Dade County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,700 vehicles a day, roughly 5% of them trucks, projected to reach 9,542 by 2042. The structure is 1,404 ft (427.9 m) long and 72 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI-95 to I-395 EB
CrossesNW 3rd Ave to NE 1st Ave
LocationE of Midtown Interchange
RouteInterstate 395
StateFlorida
Coordinates25.78726, -80.19794
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating52.9 US tons
Inventory rating37.8 US tons

Structure

Structure typeSegmental Box Girder
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans10
Design loadHL 93
Structure length1,404 ft (427.9 m)
Longest span241 ft (73.5 m)
Deck width72 ft (21.9 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,700 (2022)
Projected traffic9,542 by 2042
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 to I-395 EB over NW 3rd Ave to NE 1st Ave built?

It was built in 2023, making it 2 years old in 2025.

What condition is I-95 to I-395 EB over NW 3rd Ave to NE 1st Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does I-95 to I-395 EB over NW 3rd Ave to NE 1st Ave carry?

About 8,700 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is I-95 to I-395 EB over NW 3rd Ave to NE 1st Ave?

The structure is 1,404 ft (427.9 m) long with a longest span of 241 ft (73.5 m) and a deck 72 ft wide.

Who owns I-95 to I-395 EB over NW 3rd Ave to NE 1st Ave?

It is owned by the State Highway Agency.