I-395 EB (870575) over NW 3rd Ave to US-1 (SR5)
FairMiami-Dade County, Florida · E of Midtown Interchange · Structure no. 870373
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 4,014 ft
- 7 main spans
- Daily traffic
- 71,500
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-395 EB (870575) over NW 3rd Ave to US-1 (SR5) is a prestressed concrete stringer/multi-beam or girder carrying I-395 EB (870575) over NW 3rd Ave to US-1 (SR5) in Miami-Dade County, Florida. It was built in 1970, so it is 55 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 71,500 vehicles a day, roughly 4% of them trucks, projected to reach 124,052 by 2044. The structure is 4,014 ft (1,223.5 m) long and 42 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-395 EB (870575) over NW 3rd Ave to US-1 (SR5) built?
It was built in 1970, making it 55 years old in 2025.
What condition is I-395 EB (870575) over NW 3rd Ave to US-1 (SR5) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does I-395 EB (870575) over NW 3rd Ave to US-1 (SR5) carry?
About 71,500 vehicles per day (2024 count), of which roughly 4% are trucks.
How long is I-395 EB (870575) over NW 3rd Ave to US-1 (SR5)?
The structure is 4,014 ft (1,223.5 m) long with a longest span of 165 ft (50.3 m) and a deck 42 ft wide.
Who owns I-395 EB (870575) over NW 3rd Ave to US-1 (SR5)?
It is owned by the State Highway Agency.