US Bridges

I-395 WB over NW 3rd Ave to NE 2st Ave

Good

Miami-Dade County, Florida · Midtown Interchange · Structure no. 871199

Built
2023
2 years old
Condition
Good
inspected December 2023
Type
Segmental Box Girder
Prestressed Concrete Continuous
Length
3,094 ft
12 main spans
Daily traffic
39,500
2023 count
Owner
State
State Highway Agency

About this bridge

I-395 WB over NW 3rd Ave to NE 2st Ave is a prestressed concrete continuous segmental box girder carrying I-395 WB over NW 3rd Ave to NE 2st Ave in Miami-Dade County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 39,500 vehicles a day, roughly 5% of them trucks, projected to reach 68,532 by 2044. The structure is 3,094 ft (943.1 m) long and 49 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI-395 WB
CrossesNW 3rd Ave to NE 2st Ave
LocationMidtown Interchange
RouteInterstate 395
StateFlorida
Coordinates25.78802, -80.19771
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure9 ExcellentNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating27.9 US tons
Inventory rating26.3 US tons

Structure

Structure typeSegmental Box Girder
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans12
Design loadHL 93
Structure length3,094 ft (943.1 m)
Longest span249 ft (76 m)
Deck width49 ft (14.8 m)
Roadway width46 ft (14 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic39,500 (2023)
Projected traffic68,532 by 2044
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-395 WB over NW 3rd Ave to NE 2st Ave built?

It was built in 2023, making it 2 years old in 2025.

What condition is I-395 WB over NW 3rd Ave to NE 2st Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does I-395 WB over NW 3rd Ave to NE 2st Ave carry?

About 39,500 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is I-395 WB over NW 3rd Ave to NE 2st Ave?

The structure is 3,094 ft (943.1 m) long with a longest span of 249 ft (76 m) and a deck 49 ft wide.

Who owns I-395 WB over NW 3rd Ave to NE 2st Ave?

It is owned by the State Highway Agency.