US Bridges

SR 836 WB over NW 3rd Ave

Good

Miami-Dade County, Florida · Midtown Interchange · Structure no. 871198

Built
2023
2 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
159 ft
1 main span
Daily traffic
61,500
2023 count
Owner
State
State Highway Agency

About this bridge

SR 836 WB over NW 3rd Ave is a prestressed concrete stringer/multi-beam or girder carrying SR 836 WB over NW 3rd Ave in Miami-Dade County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 61,500 vehicles a day, roughly 3% of them trucks, projected to reach 106,703 by 2042. The structure is 159 ft (48.5 m) long and 40 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR 836 WB
CrossesNW 3rd Ave
LocationMidtown Interchange
RouteState Highway 836
StateFlorida
Coordinates25.78928, -80.20085
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.4 US tons
Inventory rating56.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length159 ft (48.5 m)
Longest span159 ft (48.5 m)
Deck width40 ft (12.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic61,500 (2023)
Projected traffic106,703 by 2042
Trucks3%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 836 WB over NW 3rd Ave built?

It was built in 2023, making it 2 years old in 2025.

What condition is SR 836 WB over NW 3rd Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does SR 836 WB over NW 3rd Ave carry?

About 61,500 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is SR 836 WB over NW 3rd Ave?

The structure is 159 ft (48.5 m) long with a longest span of 159 ft (48.5 m) and a deck 40 ft wide.

Who owns SR 836 WB over NW 3rd Ave?

It is owned by the State Highway Agency.