US Bridges

I-295 NB (SR-9A) over SR-105 Heckscher Dr.

Good

Duval County, Florida · 1.4 Mi. N. of Dames Pt. · Structure no. 720539

Built
1988
37 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
210 ft
4 main spans
Daily traffic
34,250
2023 count
Owner
State
State Highway Agency

About this bridge

I-295 NB (SR-9A) over SR-105 Heckscher Dr. is a prestressed concrete stringer/multi-beam or girder carrying I-295 NB (SR-9A) over SR-105 Heckscher Dr. in Duval County, Florida. It was built in 1988, so it is 37 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 34,250 vehicles a day, roughly 14% of them trucks, projected to reach 59,424 by 2045. The structure is 210 ft (64 m) long and 43 ft wide.

CarriesI-295 NB (SR-9A)
CrossesSR-105 Heckscher Dr.
Location1.4 Mi. N. of Dames Pt.
RouteInterstate 295
StateFlorida
Coordinates30.41214, -81.56464
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.7 US tons
Inventory rating34.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length210 ft (64 m)
Longest span71 ft (21.6 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic34,250 (2023)
Projected traffic59,424 by 2045
Trucks14%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-295 NB (SR-9A) over SR-105 Heckscher Dr. built?

It was built in 1988, making it 37 years old in 2025.

What condition is I-295 NB (SR-9A) over SR-105 Heckscher Dr. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does I-295 NB (SR-9A) over SR-105 Heckscher Dr. carry?

About 34,250 vehicles per day (2023 count), of which roughly 14% are trucks.

How long is I-295 NB (SR-9A) over SR-105 Heckscher Dr.?

The structure is 210 ft (64 m) long with a longest span of 71 ft (21.6 m) and a deck 43 ft wide.

Who owns I-295 NB (SR-9A) over SR-105 Heckscher Dr.?

It is owned by the State Highway Agency.