US Bridges

I-295 NB (SR-9A) over New Berlin Rd. & Csxrr

Good

Duval County, Florida · I-295NB (SR-9A)/NEW Ber. · Structure no. 720487

Built
1984
41 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
318 ft
4 main spans
Daily traffic
37,500
2023 count
Owner
State
State Highway Agency

About this bridge

I-295 NB (SR-9A) over New Berlin Rd. & Csxrr is a prestressed concrete stringer/multi-beam or girder carrying I-295 NB (SR-9A) over New Berlin Rd. & Csxrr in Duval County, Florida. It was built in 1984, so it is 41 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 37,500 vehicles a day, roughly 14% of them trucks, projected to reach 64,875 by 2045. The structure is 318 ft (96.9 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-295 NB (SR-9A)
CrossesNew Berlin Rd. & Csxrr
LocationI-295NB (SR-9A)/NEW Ber.
RouteInterstate 295
StateFlorida
Coordinates30.42084, -81.56702
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.7 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length318 ft (96.9 m)
Longest span108 ft (32.9 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic37,500 (2023)
Projected traffic64,875 by 2045
Trucks14%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-295 NB (SR-9A) over New Berlin Rd. & Csxrr built?

It was built in 1984, making it 41 years old in 2025.

What condition is I-295 NB (SR-9A) over New Berlin Rd. & Csxrr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does I-295 NB (SR-9A) over New Berlin Rd. & Csxrr carry?

About 37,500 vehicles per day (2023 count), of which roughly 14% are trucks.

How long is I-295 NB (SR-9A) over New Berlin Rd. & Csxrr?

The structure is 318 ft (96.9 m) long with a longest span of 108 ft (32.9 m) and a deck 43 ft wide.

Who owns I-295 NB (SR-9A) over New Berlin Rd. & Csxrr?

It is owned by the State Highway Agency.