US Bridges

I-295 NB (SR-9A) over New Berlin Rd. & Csxrr

Good

Duval County, Florida · 0.7 Mi.S.Of Heckscher Dr. · Structure no. 720537

Built
1988
37 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
335 ft
4 main spans
Daily traffic
42,161
2023 count
Owner
State
State Highway Agency

About this bridge

I-295 NB (SR-9A) over New Berlin Rd. & Csxrr is a prestressed concrete stringer/multi-beam or girder carrying I-295 NB (SR-9A) over New Berlin Rd. & Csxrr in Duval County, Florida. It was built in 1988, so it is 37 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 42,161 vehicles a day, roughly 10% of them trucks, projected to reach 73,148 by 2045. The structure is 335 ft (102.1 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-295 NB (SR-9A)
CrossesNew Berlin Rd. & Csxrr
Location0.7 Mi.S.Of Heckscher Dr.
RouteInterstate 295
StateFlorida
Coordinates30.40222, -81.56421
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.4 US tons
Inventory rating25.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length335 ft (102.1 m)
Longest span97 ft (29.6 m)
Deck width59 ft (17.9 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic42,161 (2023)
Projected traffic73,148 by 2045
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-295 NB (SR-9A) over New Berlin Rd. & Csxrr built?

It was built in 1988, making it 37 years old in 2025.

What condition is I-295 NB (SR-9A) over New Berlin Rd. & Csxrr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does I-295 NB (SR-9A) over New Berlin Rd. & Csxrr carry?

About 42,161 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is I-295 NB (SR-9A) over New Berlin Rd. & Csxrr?

The structure is 335 ft (102.1 m) long with a longest span of 97 ft (29.6 m) and a deck 59 ft wide.

Who owns I-295 NB (SR-9A) over New Berlin Rd. & Csxrr?

It is owned by the State Highway Agency.