I-295 (SR-9A) over New Berlin RD & Csxrr
GoodDuval County, Florida · I-295 NB Ramp/Berlin Rd. · Structure no. 720801
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 444 ft
- 3 main spans
- Daily traffic
- 12,500
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-295 (SR-9A) over New Berlin RD & Csxrr is a prestressed concrete stringer/multi-beam or girder carrying I-295 (SR-9A) over New Berlin RD & Csxrr in Duval County, Florida. It was built in 2016, so it is 9 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 12,500 vehicles a day, roughly 14% of them trucks, projected to reach 21,688 by 2044. The structure is 444 ft (135.3 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-295 (SR-9A) over New Berlin RD & Csxrr built?
It was built in 2016, making it 9 years old in 2025.
What condition is I-295 (SR-9A) over New Berlin RD & Csxrr in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does I-295 (SR-9A) over New Berlin RD & Csxrr carry?
About 12,500 vehicles per day (2022 count), of which roughly 14% are trucks.
How long is I-295 (SR-9A) over New Berlin RD & Csxrr?
The structure is 444 ft (135.3 m) long with a longest span of 164 ft (50 m) and a deck 43 ft wide.
Who owns I-295 (SR-9A) over New Berlin RD & Csxrr?
It is owned by the State Highway Agency.