Montecito ST over Mission Creek
FairSanta Barbara County, California · 0.05 MI W Chapala ST · Structure no. 51C0249
- Built
- 1915
- 110 years old
- Condition
- Fair
- inspected February 2024
- Type
- Tee Beam
- Concrete
- Length
- 41 ft
- 1 main span
- Daily traffic
- 3,200
- 2016 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Montecito ST over Mission Creek is a concrete tee beam carrying Montecito ST over Mission Creek in Santa Barbara County, California. It was built in 1915, so it is 110 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,200 vehicles a day, roughly 1% of them trucks, projected to reach 4,555 by 2046. The structure is 41 ft (12.5 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Montecito ST over Mission Creek built?
It was built in 1915, making it 110 years old in 2025.
What condition is Montecito ST over Mission Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Montecito ST over Mission Creek carry?
About 3,200 vehicles per day (2016 count), of which roughly 1% are trucks.
How long is Montecito ST over Mission Creek?
The structure is 41 ft (12.5 m) long with a longest span of 39 ft (11.9 m) and a deck 60 ft wide.
Who owns Montecito ST over Mission Creek?
It is owned by the City or Municipal Highway Agency.