US Bridges

US Highway 101 NB over Mission Creek

Fair

Santa Barbara County, California · 05-SB-101-13.96-SB · Structure no. 51 0277R

Built
1990
35 years old
Condition
Fair
inspected January 2024
Type
Slab
Concrete
Length
40 ft
1 main span
Daily traffic
54,500
2009 count
Owner
State
State Highway Agency

About this bridge

US Highway 101 NB over Mission Creek is a concrete slab carrying US Highway 101 NB over Mission Creek in Santa Barbara County, California. It was built in 1990, so it is 35 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 54,500 vehicles a day, roughly 5% of them trucks, projected to reach 59,482 by 2044. The structure is 40 ft (12.2 m) long and 63 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS Highway 101 NB
CrossesMission Creek
Location05-SB-101-13.96-SB
RouteU.S. Route 101
Coordinates34.4135, -119.69544
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length40 ft (12.2 m)
Longest span38 ft (11.6 m)
Deck width63 ft (19.2 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic54,500 (2009)
Projected traffic59,482 by 2044
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US Highway 101 NB over Mission Creek built?

It was built in 1990, making it 35 years old in 2025.

What condition is US Highway 101 NB over Mission Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does US Highway 101 NB over Mission Creek carry?

About 54,500 vehicles per day (2009 count), of which roughly 5% are trucks.

How long is US Highway 101 NB over Mission Creek?

The structure is 40 ft (12.2 m) long with a longest span of 38 ft (11.6 m) and a deck 63 ft wide.

Who owns US Highway 101 NB over Mission Creek?

It is owned by the State Highway Agency.