US Bridges

US Highway 101 NB over Mission Creek

Good

Santa Barbara County, California · 05-SB-101-13.93-SB · Structure no. 51 0298R

Built
1992
33 years old
Condition
Good
inspected January 2022
Type
Slab
Concrete
Length
44 ft
1 main span
Daily traffic
54,500
2009 count
Owner
State
State Highway Agency

About this bridge

US Highway 101 NB over Mission Creek is a concrete slab carrying US Highway 101 NB over Mission Creek in Santa Barbara County, California. It was built in 1992, so it is 33 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 54,500 vehicles a day, roughly 5% of them trucks, projected to reach 56,774 by 2040. The structure is 44 ft (13.4 m) long and 57 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS Highway 101 NB
CrossesMission Creek
Location05-SB-101-13.93-SB
RouteU.S. Route 101
Coordinates34.41372, -119.69503
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74 US tons
Inventory rating44.3 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length44 ft (13.4 m)
Longest span44 ft (13.4 m)
Deck width57 ft (17.4 m)
Roadway width54 ft (16.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic54,500 (2009)
Projected traffic56,774 by 2040
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US Highway 101 NB over Mission Creek built?

It was built in 1992, making it 33 years old in 2025.

What condition is US Highway 101 NB over Mission Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2022.

How much traffic does US Highway 101 NB over Mission Creek carry?

About 54,500 vehicles per day (2009 count), of which roughly 5% are trucks.

How long is US Highway 101 NB over Mission Creek?

The structure is 44 ft (13.4 m) long with a longest span of 44 ft (13.4 m) and a deck 57 ft wide.

Who owns US Highway 101 NB over Mission Creek?

It is owned by the State Highway Agency.