US Bridges

S215-5th ST Off over 5th Street

Good

San Bernardino County, California · 08-SBD-215-7.20-SBD · Structure no. 54 1253K

Built
2013
12 years old
Condition
Good
inspected February 2024
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
236 ft
3 main spans
Daily traffic
160,000
2020 count
Owner
State
State Highway Agency

About this bridge

S215-5th ST Off over 5th Street is a concrete continuous box beam or girders - multiple carrying S215-5th ST Off over 5th Street in San Bernardino County, California. It was built in 2013, so it is 12 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 160,000 vehicles a day, roughly 5% of them trucks, projected to reach 441,274 by 2046. The structure is 236 ft (72 m) long and 46 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesS215-5th ST Off
Crosses5th Street
Location08-SBD-215-7.20-SBD
RouteInterstate 215
Coordinates34.10873, -117.30298
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length236 ft (72 m)
Longest span112 ft (34 m)
Deck width46 ft (14.1 m)
Roadway width43 ft (13.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic160,000 (2020)
Projected traffic441,274 by 2046
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was S215-5th ST Off over 5th Street built?

It was built in 2013, making it 12 years old in 2025.

What condition is S215-5th ST Off over 5th Street in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does S215-5th ST Off over 5th Street carry?

About 160,000 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is S215-5th ST Off over 5th Street?

The structure is 236 ft (72 m) long with a longest span of 112 ft (34 m) and a deck 46 ft wide.

Who owns S215-5th ST Off over 5th Street?

It is owned by the State Highway Agency.