US Bridges

5th ST-S215 Onramp over S215 to 3rd ST Off Ramp

Fair

San Bernardino County, California · 08-SBD-215-7.01-SBD · Structure no. 54 1252K

Built
2013
12 years old
Condition
Fair
inspected February 2024
Type
Box Beam or Girders - Multiple
Concrete Continuous
Length
906 ft
10 main spans
Daily traffic
162,000
2020 count
Owner
State
State Highway Agency

About this bridge

5th ST-S215 Onramp over S215 to 3rd ST Off Ramp is a concrete continuous box beam or girders - multiple carrying 5th ST-S215 Onramp over S215 to 3rd ST Off Ramp in San Bernardino County, California. It was built in 2013, so it is 12 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 162,000 vehicles a day, roughly 3% of them trucks, projected to reach 447,519 by 2042. The structure is 906 ft (276 m) long and 38 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

Carries5th ST-S215 Onramp
CrossesS215 to 3rd ST Off Ramp
Location08-SBD-215-7.01-SBD
RouteInterstate 215
Coordinates34.10575, -117.30268
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans10
Design loadHS 20 + Mod
Structure length906 ft (276 m)
Longest span105 ft (32 m)
Deck width38 ft (11.7 m)
Roadway width35 ft (10.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic162,000 (2020)
Projected traffic447,519 by 2042
Trucks3%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 5th ST-S215 Onramp over S215 to 3rd ST Off Ramp built?

It was built in 2013, making it 12 years old in 2025.

What condition is 5th ST-S215 Onramp over S215 to 3rd ST Off Ramp in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does 5th ST-S215 Onramp over S215 to 3rd ST Off Ramp carry?

About 162,000 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is 5th ST-S215 Onramp over S215 to 3rd ST Off Ramp?

The structure is 906 ft (276 m) long with a longest span of 105 ft (32 m) and a deck 38 ft wide.

Who owns 5th ST-S215 Onramp over S215 to 3rd ST Off Ramp?

It is owned by the State Highway Agency.