US Bridges

Interstate 215 over Second Street

Good

San Bernardino County, California · 08-SBD-215-6.79-SBD · Structure no. 54 1259

Built
2013
12 years old
Condition
Good
inspected February 2024
Type
Box Beam or Girders - Multiple
Concrete
Length
152 ft
1 main span
Daily traffic
162,000
2020 count
Owner
State
State Highway Agency

About this bridge

Interstate 215 over Second Street is a concrete box beam or girders - multiple carrying Interstate 215 over Second Street in San Bernardino County, California. It was built in 2013, so it is 12 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 162,000 vehicles a day, roughly 5% of them trucks, projected to reach 447,519 by 2046. The structure is 152 ft (46.4 m) long and 189 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesInterstate 215
CrossesSecond Street
Location08-SBD-215-6.79-SBD
RouteInterstate 215
Coordinates34.1025, -117.30157
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length152 ft (46.4 m)
Longest span152 ft (46.4 m)
Deck width189 ft (57.6 m)
Roadway width184 ft (56.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic162,000 (2020)
Projected traffic447,519 by 2046
Trucks5%
Lanes on structure11
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Interstate 215 over Second Street built?

It was built in 2013, making it 12 years old in 2025.

What condition is Interstate 215 over Second Street in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Interstate 215 over Second Street carry?

About 162,000 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is Interstate 215 over Second Street?

The structure is 152 ft (46.4 m) long with a longest span of 152 ft (46.4 m) and a deck 189 ft wide.

Who owns Interstate 215 over Second Street?

It is owned by the State Highway Agency.