S Palm Canyon DR over Cherly Creek
GoodRiverside County, California · 0.2 Mi. N/O Bogert Trail · Structure no. 56C0352
- Built
- 1969
- 56 years old, rebuilt 2010
- Condition
- Good
- inspected February 2025
- Type
- Slab
- Concrete
- Length
- 28 ft
- 1 main span
- Daily traffic
- 3,870
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
S Palm Canyon DR over Cherly Creek is a concrete slab carrying S Palm Canyon DR over Cherly Creek in Riverside County, California. It was built in 1969 and reconstructed in 2010, so it is 56 years old, older than the California average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,870 vehicles a day, roughly 1% of them trucks, projected to reach 5,527 by 2047. The structure is 28 ft (8.5 m) long and 79 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Palm Canyon DR over Cherly Creek built?
It was built in 1969, making it 56 years old in 2025. It was reconstructed in 2010.
What condition is S Palm Canyon DR over Cherly Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does S Palm Canyon DR over Cherly Creek carry?
About 3,870 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is S Palm Canyon DR over Cherly Creek?
The structure is 28 ft (8.5 m) long with a longest span of 25 ft (7.6 m) and a deck 79 ft wide.
Who owns S Palm Canyon DR over Cherly Creek?
It is owned by the City or Municipal Highway Agency.