US Bridges

Bogert Trail over Palm Canyon Wash

Good

Riverside County, California · 0.9 MI E/O Palm Canyon DR · Structure no. 56C0311

Built
1982
43 years old
Condition
Good
inspected February 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
326 ft
4 main spans
Daily traffic
2,992
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Bogert Trail over Palm Canyon Wash is a prestressed concrete continuous stringer/multi-beam or girder carrying Bogert Trail over Palm Canyon Wash in Riverside County, California. It was built in 1982, so it is 43 years old, younger than the California average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,992 vehicles a day, roughly 1% of them trucks, projected to reach 4,262 by 2047. The structure is 326 ft (99.4 m) long and 33 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesBogert Trail
CrossesPalm Canyon Wash
Location0.9 MI E/O Palm Canyon DR
RouteCity Street 0
Coordinates33.77579, -116.53293
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2025
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating81 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length326 ft (99.4 m)
Longest span87 ft (26.5 m)
Deck width33 ft (10.1 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,992 (2021)
Projected traffic4,262 by 2047
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Bogert Trail over Palm Canyon Wash built?

It was built in 1982, making it 43 years old in 2025.

What condition is Bogert Trail over Palm Canyon Wash in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does Bogert Trail over Palm Canyon Wash carry?

About 2,992 vehicles per day (2021 count), of which roughly 1% are trucks.

How long is Bogert Trail over Palm Canyon Wash?

The structure is 326 ft (99.4 m) long with a longest span of 87 ft (26.5 m) and a deck 33 ft wide.

Who owns Bogert Trail over Palm Canyon Wash?

It is owned by the City or Municipal Highway Agency.