SR 202L over Mill Ave & Sppr
FairMaricopa County, Arizona · 6.335 MI E JCT I 10 & · Structure no. 02258
- Built
- 1993
- 32 years old, rebuilt 2009
- Condition
- Fair
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 1,029 ft
- 7 main spans
- Daily traffic
- 198,851
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR 202L over Mill Ave & Sppr is a prestressed concrete continuous box beam or girders - multiple carrying SR 202L over Mill Ave & Sppr in Maricopa County, Arizona. It was built in 1993 and reconstructed in 2009, so it is 32 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 198,851 vehicles a day, roughly 7% of them trucks, projected to reach 198,861 by 2042. The structure is 1,029 ft (313.6 m) long and 200 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 202L over Mill Ave & Sppr built?
It was built in 1993, making it 32 years old in 2025. It was reconstructed in 2009.
What condition is SR 202L over Mill Ave & Sppr in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does SR 202L over Mill Ave & Sppr carry?
About 198,851 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is SR 202L over Mill Ave & Sppr?
The structure is 1,029 ft (313.6 m) long with a longest span of 160 ft (48.8 m) and a deck 200 ft wide.
Who owns SR 202L over Mill Ave & Sppr?
It is owned by the State Highway Agency.