Center Parkway over Sl 202 (red Mountain)
GoodMaricopa County, Arizona · 6.45 MI E JCT I 10 & · Structure no. 02227
- Built
- 1993
- 32 years old
- Condition
- Good
- inspected September 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 281 ft
- 2 main spans
- Daily traffic
- 6,006
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Center Parkway over Sl 202 (red Mountain) is a prestressed concrete continuous box beam or girders - single or spread carrying Center Parkway over Sl 202 (red Mountain) in Maricopa County, Arizona. It was built in 1993, so it is 32 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,006 vehicles a day, roughly 5% of them trucks, projected to reach 6,016 by 2042. The structure is 281 ft (85.6 m) long and 55 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Center Parkway over Sl 202 (red Mountain) built?
It was built in 1993, making it 32 years old in 2025.
What condition is Center Parkway over Sl 202 (red Mountain) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Center Parkway over Sl 202 (red Mountain) carry?
About 6,006 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Center Parkway over Sl 202 (red Mountain)?
The structure is 281 ft (85.6 m) long with a longest span of 140 ft (42.7 m) and a deck 55 ft wide.
Who owns Center Parkway over Sl 202 (red Mountain)?
It is owned by the State Highway Agency.