Center Parkway over SPRR & Grand Canal
GoodMaricopa County, Arizona · 650 Ft S of Washington ST · Structure no. 09838
- Built
- 1993
- 32 years old
- Condition
- Good
- inspected September 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 240 ft
- 2 main spans
- Daily traffic
- 4,551
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Center Parkway over SPRR & Grand Canal is a prestressed concrete continuous box beam or girders - single or spread carrying Center Parkway over SPRR & Grand Canal in Maricopa County, Arizona. It was built in 1993, so it is 32 years old, younger than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,551 vehicles a day, roughly 10% of them trucks, projected to reach 4,561 by 2042. The structure is 240 ft (73.2 m) long and 85 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Center Parkway over SPRR & Grand Canal built?
It was built in 1993, making it 32 years old in 2025.
What condition is Center Parkway over SPRR & Grand Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Center Parkway over SPRR & Grand Canal carry?
About 4,551 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is Center Parkway over SPRR & Grand Canal?
The structure is 240 ft (73.2 m) long with a longest span of 118 ft (36 m) and a deck 85 ft wide.
Who owns Center Parkway over SPRR & Grand Canal?
It is owned by the City or Municipal Highway Agency.