IRR BIA RTE 119 over West Way Drain
FairLa Paz County, Arizona · 0.8 KM E of BIA 21/24 JCT · Structure no. 00000000000H018
- Built
- 1969
- 56 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 75 ft
- 3 main spans
- Daily traffic
- 100
- 2024 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE 119 over West Way Drain is a concrete stringer/multi-beam or girder carrying IRR BIA RTE 119 over West Way Drain in La Paz County, Arizona. It was built in 1969, so it is 56 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 15% of them trucks, projected to reach 130 by 2044. The structure is 75 ft (23 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE 119 over West Way Drain built?
It was built in 1969, making it 56 years old in 2025.
What condition is IRR BIA RTE 119 over West Way Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does IRR BIA RTE 119 over West Way Drain carry?
About 100 vehicles per day (2024 count), of which roughly 15% are trucks.
How long is IRR BIA RTE 119 over West Way Drain?
The structure is 75 ft (23 m) long with a longest span of 25 ft (7.6 m) and a deck 28 ft wide.
Who owns IRR BIA RTE 119 over West Way Drain?
It is owned by the Bureau of Indian Affairs.