Geronimo Trail over Sycamore Creek
FairCochise County, Arizona · 28.4 MI E JCT SR 80 · Structure no. 08104
- Built
- 1936
- 89 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 27 ft
- 1 main span
- Daily traffic
- 40
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Geronimo Trail over Sycamore Creek is a steel stringer/multi-beam or girder carrying Geronimo Trail over Sycamore Creek in Cochise County, Arizona. It was built in 1936, so it is 89 years old, older than the Arizona average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 40 vehicles a day, projected to reach 50 by 2041. The structure is 27 ft (8.2 m) long and 20 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Geronimo Trail over Sycamore Creek built?
It was built in 1936, making it 89 years old in 2025.
What condition is Geronimo Trail over Sycamore Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Geronimo Trail over Sycamore Creek carry?
About 40 vehicles per day (2021 count).
How long is Geronimo Trail over Sycamore Creek?
The structure is 27 ft (8.2 m) long with a longest span of 25 ft (7.6 m) and a deck 20 ft wide.
Who owns Geronimo Trail over Sycamore Creek?
It is owned by the County Highway Agency.