US Bridges

Geronimo Trail over Miller Creek

Good

Cochise County, Arizona · .2 MI S/O Miller Spring · Structure no. 030501000003201

Built
1958
67 years old
Condition
Good
inspected April 2024
Type
Slab
Concrete
Length
25 ft
1 main span
Daily traffic
50
2022 count
Owner
Federal
U.S. Forest Service

About this bridge

Geronimo Trail over Miller Creek is a concrete slab carrying Geronimo Trail over Miller Creek in Cochise County, Arizona. It was built in 1958, so it is 67 years old, older than the Arizona average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2040. The structure is 25 ft (7.6 m) long and 16 ft wide. If it were closed, the detour would be 98.2 mi (158 km).

CarriesGeronimo Trail
CrossesMiller Creek
Location.2 MI S/O Miller Spring
RouteFederal Lands Road 63
StateArizona
Coordinates31.48872, -109.07379
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating29.3 US tons
Inventory rating22.5 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length25 ft (7.6 m)
Longest span24 ft (7.3 m)
Deck width16 ft (4.9 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2022)
Projected traffic75 by 2040
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.2 mi (158 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$170,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Geronimo Trail over Miller Creek built?

It was built in 1958, making it 67 years old in 2025.

What condition is Geronimo Trail over Miller Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Geronimo Trail over Miller Creek carry?

About 50 vehicles per day (2022 count).

How long is Geronimo Trail over Miller Creek?

The structure is 25 ft (7.6 m) long with a longest span of 24 ft (7.3 m) and a deck 16 ft wide.

Who owns Geronimo Trail over Miller Creek?

It is owned by the U.S. Forest Service.