US Bridges

Lrd Lawson DR over Puchyan River

Good

Green Lake County, Wisconsin · 0.2M W JCT Sth 49 · Structure no. B24004000000000

Built
2013
12 years old
Condition
Good
inspected May 2024
Type
Slab
Concrete
Length
40 ft
1 main span
Daily traffic
808
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Lawson DR over Puchyan River is a concrete slab carrying Lrd Lawson DR over Puchyan River in Green Lake County, Wisconsin. It was built in 2013, so it is 12 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 808 vehicles a day, roughly 17% of them trucks, projected to reach 888 by 2043. The structure is 40 ft (12.3 m) long and 31 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesLrd Lawson DR
CrossesPuchyan River
Location0.2M W JCT Sth 49
RouteCity Street 0
Coordinates43.85682, -88.94677
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.4 US tons
Inventory rating38.6 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length40 ft (12.3 m)
Longest span38 ft (11.6 m)
Deck width31 ft (9.3 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic808 (2022)
Projected traffic888 by 2043
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Lawson DR over Puchyan River built?

It was built in 2013, making it 12 years old in 2025.

What condition is Lrd Lawson DR over Puchyan River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Lrd Lawson DR over Puchyan River carry?

About 808 vehicles per day (2022 count), of which roughly 17% are trucks.

How long is Lrd Lawson DR over Puchyan River?

The structure is 40 ft (12.3 m) long with a longest span of 38 ft (11.6 m) and a deck 31 ft wide.

Who owns Lrd Lawson DR over Puchyan River?

It is owned by the Town or Township Highway Agency.