US Bridges

Cth a over Puchyan River

Good

Green Lake County, Wisconsin · 0.9 MI S JCT Cth J · Structure no. B24003200000000

Built
2004
21 years old
Condition
Good
inspected September 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
51 ft
1 main span
Daily traffic
466
2022 count
Owner
County
County Highway Agency

About this bridge

Cth a over Puchyan River is a prestressed concrete box beam or girders - multiple carrying Cth a over Puchyan River in Green Lake County, Wisconsin. It was built in 2004, so it is 21 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 466 vehicles a day, projected to reach 512 by 2042. The structure is 51 ft (15.5 m) long and 31 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesCth a
CrossesPuchyan River
Location0.9 MI S JCT Cth J
RouteCounty Highway 0A
Coordinates43.86086, -88.97636
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.6 US tons
Inventory rating44.6 US tons

Structure

MaterialPrestressed Concrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length51 ft (15.5 m)
Longest span48 ft (14.6 m)
Deck width31 ft (9.6 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic466 (2022)
Projected traffic512 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cth a over Puchyan River built?

It was built in 2004, making it 21 years old in 2025.

What condition is Cth a over Puchyan River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Cth a over Puchyan River carry?

About 466 vehicles per day (2022 count).

How long is Cth a over Puchyan River?

The structure is 51 ft (15.5 m) long with a longest span of 48 ft (14.6 m) and a deck 31 ft wide.

Who owns Cth a over Puchyan River?

It is owned by the County Highway Agency.