IH 39 NB / IH 90 W over Cth W
GoodDane County, Wisconsin · 4.8M W JCT Ush 51 to N · Structure no. B13071500000000
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 159 ft
- 1 main span
- Daily traffic
- 28,325
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
IH 39 NB / IH 90 W over Cth W is a prestressed concrete stringer/multi-beam or girder carrying IH 39 NB / IH 90 W over Cth W in Dane County, Wisconsin. It was built in 2018, so it is 7 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 28,325 vehicles a day, roughly 29% of them trucks, projected to reach 35,150 by 2040. The structure is 159 ft (48.6 m) long and 63 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 39 NB / IH 90 W over Cth W built?
It was built in 2018, making it 7 years old in 2025.
What condition is IH 39 NB / IH 90 W over Cth W in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does IH 39 NB / IH 90 W over Cth W carry?
About 28,325 vehicles per day (2022 count), of which roughly 29% are trucks.
How long is IH 39 NB / IH 90 W over Cth W?
The structure is 159 ft (48.6 m) long with a longest span of 153 ft (46.6 m) and a deck 63 ft wide.
Who owns IH 39 NB / IH 90 W over Cth W?
It is owned by the State Highway Agency.