US Bridges

IH 39 SB / IH 90 E over Cth W

Good

Dane County, Wisconsin · 4.9M E JCT Cth N to W · Structure no. B13071400000000

Built
2019
6 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
159 ft
1 main span
Daily traffic
28,325
2022 count
Owner
State
State Highway Agency

About this bridge

IH 39 SB / IH 90 E over Cth W is a prestressed concrete stringer/multi-beam or girder carrying IH 39 SB / IH 90 E over Cth W in Dane County, Wisconsin. It was built in 2019, so it is 6 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 28,325 vehicles a day, roughly 29% of them trucks, projected to reach 350,150 by 2040. The structure is 159 ft (48.6 m) long and 63 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesIH 39 SB / IH 90 E
CrossesCth W
Location4.9M E JCT Cth N to W
RouteInterstate 39
Coordinates42.97918, -89.12167
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.4 US tons
Inventory rating44 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length159 ft (48.6 m)
Longest span153 ft (46.6 m)
Deck width63 ft (19.1 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic28,325 (2022)
Projected traffic350,150 by 2040
Trucks29%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 39 SB / IH 90 E over Cth W built?

It was built in 2019, making it 6 years old in 2025.

What condition is IH 39 SB / IH 90 E over Cth W in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does IH 39 SB / IH 90 E over Cth W carry?

About 28,325 vehicles per day (2022 count), of which roughly 29% are trucks.

How long is IH 39 SB / IH 90 E over Cth W?

The structure is 159 ft (48.6 m) long with a longest span of 153 ft (46.6 m) and a deck 63 ft wide.

Who owns IH 39 SB / IH 90 E over Cth W?

It is owned by the State Highway Agency.