US 2 over Ebey Slough Drainage
FairSnohomish County, Washington · 2.3 E JCT I-5 · Structure no. 0013995B0000000
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 1,318 ft
- 3 main spans
- Daily traffic
- 15,507
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 2 over Ebey Slough Drainage is a prestressed concrete continuous box beam or girders - multiple carrying US 2 over Ebey Slough Drainage in Snohomish County, Washington. It was built in 1993, so it is 32 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,507 vehicles a day, roughly 4% of them trucks, projected to reach 21,950 by 2039. The structure is 1,318 ft (401.7 m) long and 41 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 2 over Ebey Slough Drainage built?
It was built in 1993, making it 32 years old in 2025.
What condition is US 2 over Ebey Slough Drainage in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does US 2 over Ebey Slough Drainage carry?
About 15,507 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is US 2 over Ebey Slough Drainage?
The structure is 1,318 ft (401.7 m) long with a longest span of 168 ft (51.2 m) and a deck 41 ft wide.
Who owns US 2 over Ebey Slough Drainage?
It is owned by the State Highway Agency.