US Bridges

US 2 over Ebey Slough

Fair

Snohomish County, Washington · 1.9 E JCT I-5 · Structure no. 0007923B0000000

Built
1967
58 years old
Condition
Fair
inspected March 2024
Type
Channel Beam
Concrete
Length
495 ft
13 main spans
Daily traffic
402
2023 count
Owner
State
State Highway Agency

About this bridge

US 2 over Ebey Slough is a concrete channel beam carrying US 2 over Ebey Slough in Snohomish County, Washington. It was built in 1967, so it is 58 years old, older than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 402 vehicles a day, roughly 15% of them trucks, projected to reach 379 by 2039. The structure is 495 ft (150.9 m) long and 24 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 2
CrossesEbey Slough
Location1.9 E JCT I-5
RouteU.S. Route 2
Coordinates47.97833, -122.14639
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckOther
Main spans13
Design loadHS 20
Structure length495 ft (150.9 m)
Longest span38 ft (11.6 m)
Deck width24 ft (7.3 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic402 (2023)
Projected traffic379 by 2039
Trucks15%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$7.5 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was US 2 over Ebey Slough built?

It was built in 1967, making it 58 years old in 2025.

What condition is US 2 over Ebey Slough in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does US 2 over Ebey Slough carry?

About 402 vehicles per day (2023 count), of which roughly 15% are trucks.

How long is US 2 over Ebey Slough?

The structure is 495 ft (150.9 m) long with a longest span of 38 ft (11.6 m) and a deck 24 ft wide.

Who owns US 2 over Ebey Slough?

It is owned by the State Highway Agency.