Cooke Canyon Road over Hiline Canal
GoodKittitas County, Washington · 0.24 N Brickmill RD · Structure no. 089504000000000
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected June 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 53 ft
- 1 main span
- Daily traffic
- 235
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Cooke Canyon Road over Hiline Canal is a prestressed concrete slab carrying Cooke Canyon Road over Hiline Canal in Kittitas County, Washington. It was built in 2024, so it is 1 years old, younger than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 235 vehicles a day, projected to reach 264 by 2043. The structure is 53 ft (16.2 m) long and 44 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cooke Canyon Road over Hiline Canal built?
It was built in 2024, making it 1 years old in 2025.
What condition is Cooke Canyon Road over Hiline Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does Cooke Canyon Road over Hiline Canal carry?
About 235 vehicles per day (2023 count).
How long is Cooke Canyon Road over Hiline Canal?
The structure is 53 ft (16.2 m) long with a longest span of 51 ft (15.5 m) and a deck 44 ft wide.
Who owns Cooke Canyon Road over Hiline Canal?
It is owned by the County Highway Agency.