Fairview Road over Hiline Canal
FairPosted for loadKittitas County, Washington · 01.18 N Rader RD · Structure no. 079902000000000
- Built
- 1931
- 94 years old, rebuilt 1976
- Condition
- Fair
- inspected October 2023
- Type
- Slab
- Concrete
- Length
- 48 ft
- 1 main span
- Daily traffic
- 249
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Fairview Road over Hiline Canal is a concrete slab carrying Fairview Road over Hiline Canal in Kittitas County, Washington. It was built in 1931 and reconstructed in 1976, so it is 94 years old, older than the Washington average of 49.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 249 vehicles a day, roughly 41% of them trucks, projected to reach 225 by 2041. The structure is 48 ft (14.6 m) long and 30 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fairview Road over Hiline Canal built?
It was built in 1931, making it 94 years old in 2025. It was reconstructed in 1976.
What condition is Fairview Road over Hiline Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Fairview Road over Hiline Canal carry?
About 249 vehicles per day (2023 count), of which roughly 41% are trucks.
How long is Fairview Road over Hiline Canal?
The structure is 48 ft (14.6 m) long with a longest span of 46 ft (14 m) and a deck 30 ft wide.
Who owns Fairview Road over Hiline Canal?
It is owned by the County Highway Agency.