US Bridges

Faust Road over Town Ditch

Good

Kittitas County, Washington · 0.55 N US 97 · Structure no. 089503000000000

Built
2024
1 years old
Condition
Good
inspected June 2024
Type
Slab
Prestressed Concrete
Length
46 ft
1 main span
Daily traffic
228
2022 count
Owner
County
County Highway Agency

About this bridge

Faust Road over Town Ditch is a prestressed concrete slab carrying Faust Road over Town Ditch in Kittitas County, Washington. It was built in 2024, so it is 1 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 228 vehicles a day, projected to reach 257 by 2042. The structure is 46 ft (14 m) long and 40 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesFaust Road
CrossesTown Ditch
Location0.55 N US 97
RouteCounty Highway 34761
Coordinates47.03083, -120.59261
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating81.5 US tons
Inventory rating56.4 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length46 ft (14 m)
Longest span44 ft (13.4 m)
Deck width40 ft (12.2 m)
Roadway width37 ft (11.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic228 (2022)
Projected traffic257 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Faust Road over Town Ditch built?

It was built in 2024, making it 1 years old in 2025.

What condition is Faust Road over Town Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Faust Road over Town Ditch carry?

About 228 vehicles per day (2022 count).

How long is Faust Road over Town Ditch?

The structure is 46 ft (14 m) long with a longest span of 44 ft (13.4 m) and a deck 40 ft wide.

Who owns Faust Road over Town Ditch?

It is owned by the County Highway Agency.