US Bridges

W. Bowers Road over Town Ditch

Good

Kittitas County, Washington · 0.17 MI West of Reecer CR · Structure no. 089495000000000

Built
2017
8 years old
Condition
Good
inspected January 2024
Type
Girder and Floorbeam System
Prestressed Concrete
Length
44 ft
1 main span
Daily traffic
250
2022 count
Owner
County
County Highway Agency

About this bridge

W. Bowers Road over Town Ditch is a prestressed concrete girder and floorbeam system carrying W. Bowers Road over Town Ditch in Kittitas County, Washington. It was built in 2017, so it is 8 years old, younger than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 250 vehicles a day, roughly 10% of them trucks, projected to reach 253 by 2042. The structure is 44 ft (13.4 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesW. Bowers Road
CrossesTown Ditch
Location0.17 MI West of Reecer CR
RouteCounty Highway 10779
Coordinates47.02831, -120.57539
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.9 US tons
Inventory rating41.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length44 ft (13.4 m)
Longest span43 ft (13.1 m)
Deck width30 ft (9.1 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic250 (2022)
Projected traffic253 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.9 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was W. Bowers Road over Town Ditch built?

It was built in 2017, making it 8 years old in 2025.

What condition is W. Bowers Road over Town Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does W. Bowers Road over Town Ditch carry?

About 250 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is W. Bowers Road over Town Ditch?

The structure is 44 ft (13.4 m) long with a longest span of 43 ft (13.1 m) and a deck 30 ft wide.

Who owns W. Bowers Road over Town Ditch?

It is owned by the County Highway Agency.