Military Hwy. over NS Railway
GoodChesapeake city, Virginia · 3.34 to 17 / 1.14 FR 58 · Structure no. 000000000021830
- Built
- 1938
- 87 years old, rebuilt 2019
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 147 ft
- 3 main spans
- Daily traffic
- 10,141
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Military Hwy. over NS Railway is a steel continuous stringer/multi-beam or girder carrying Military Hwy. over NS Railway in Chesapeake city, Virginia. It was built in 1938 and reconstructed in 2019, so it is 87 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,141 vehicles a day, roughly 1% of them trucks, projected to reach 13,054 by 2042. The structure is 147 ft (44.8 m) long and 49 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Military Hwy. over NS Railway built?
It was built in 1938, making it 87 years old in 2025. It was reconstructed in 2019.
What condition is Military Hwy. over NS Railway in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Military Hwy. over NS Railway carry?
About 10,141 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Military Hwy. over NS Railway?
The structure is 147 ft (44.8 m) long with a longest span of 49 ft (14.8 m) and a deck 49 ft wide.
Who owns Military Hwy. over NS Railway?
It is owned by the City or Municipal Highway Agency.